![]() MAIN PAGEMODIS INFOINSTRUMENT OPS
|
Level 1B
|
|
The solid bars show the specifications. The individual detector (channel) results are shown pre-launch and post launch - both for operation on the A-side and the B-side electronics. Note that the switch to B-side electronics significantly reduced noise in several bands.
Please contact Jack Xiong with any technical questions concerning these pages. |
|
Responsible Civil Servant:
|