MODIS IOT Aqua Weekly Report
Mission Operations Days: 2006/126 through 2006/132
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Nominal Science Mode |
||
| Component | State(s) | Comment |
|---|---|---|
| Blackbody | A Off; B On (285K) | Nominal Science Mode |
| Calibration Electronics | A Off; B On | Nominal Science Mode |
| Control Processor | A Off; B On | Nominal Science Mode |
| Nadir Door | Unlatched, Open | Nominal Science Mode |
| Space View Door | Unlatched, Open | Nominal Science Mode |
| Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
| FDDI Formatter | A Off; B On | Nominal Science Mode |
| FDDI Port | A Off; B On | Nominal Science Mode |
| FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal Science Mode |
| Format Processor | A Off; B On | Nominal Science Mode |
| Power Supplies | #1 Off, #2 On | Nominal Science Mode |
| PV VIS FPA | A Off; B On | Nominal Science Mode |
| PV NIR FPA | A Off; B On | Nominal Science Mode |
| PV SMIR FPA | A Off; B On | Nominal Science Mode |
| PV LWIR FPA | A Off; B On | Nominal Science Mode |
| PC LWIR FPA | A Off; B On | Nominal Science Mode |
| RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
| RC LWIR FPA Heater | Off | Nominal Science Mode |
| RC SMIR FPA Heater | On (83K) | Nominal Science Mode |
| Scan Assembly | A Off; B On | Nominal Science Mode |
| SDSM | Off | Nominal Science Mode |
| SRCA | Off
| Nominal Science Mode |
| PS1 Survival Heaters | Enabled | Nominal Science Mode |
| PS2 Survival Heaters | Enabled | Nominal Science Mode |
| Timing Generator | A Off; B On | Nominal Science Mode |
| Flight Software | Rev BJ + 1 set of patches
| Nominal Science Mode |
| Inhibit Ids Set | None | Nominal Science Mode |
None
Sunday, May 7, 2006None
Monday, May 8, 2006Lunar Roll Maneuver (-5.5124 deg roll)
2006/128 09:21:34-10:07:38 MCL MOD_OA03_FR_DAY_RATE
2006/128 10:07:38-10:30:56 MCL MOD_OA03_FR_NIGHT_RATE (03:23 early)
2006/128 10:30:56-10:37:42 MCL MOD_OA08_ROLL_MAN
2006/128 11:03:50-11:49:54 MCL MOD_OA03_FR_DAY_RATE (03:23 late)
2006/128 11:49:54-12:39:21 MCL MOD_OA03_FR_NIGHT_RATE
None
Wednesday, May 10, 2006None
Thursday, May 11, 2006None
Friday, May 12, 20062006/132 18:56:27-18:57:15 Real-Time MOD_MEM_PM_DUMP('motor_constants',35,0,0,1,2)
2006/132 18:57:32-18:58:16 Real-Time MOD_MEM_PM_DUMP('motor_trigger_data',60,0,0,1,2)
2006/132 18:58:32-18:59:01 Real-Time MOD_MEM_PM_DUMP('motor_pos_when_hit',12,0,0,1,1)
2006/132 18:59:13-18:59:44 Real-Time MOD_MEM_PM_DUMP('door_data',12,0,0,1,1)
None
Calibrations for May will include triweekly SDSM, monthly SRCA Full Radiometric, and quarterly SRCA Full Spatial.
Monday, May 15, 20062006/135 20:49:55-21:03:53 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B-Side
2006/135 22:28:48-22:42:46 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Open - B-Side
2006/136 00:05:00-00:05:16 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode
2006/136 00:59:33-01:33:46 MCL MOD_OA19_SRCA_FULL_RAD.2
OA-19: SRCA Full Radiometric Calibration - B Side
Data Collect from 01:15:34-01:19:27.
2006/136 07:25:00-07:25:16 MCL MOD_SRCA_SETUP_L1_L4_L5_CC.1
SRCA setup activity using lamps 1, 4, and 5, and in constant current feedback mode
2006/136 07:35:06-08:32:36 MCL MOD_OA23_FULL_SPAT.2
OA-23: SRCA Full Spatial Calibration - B Side
Data Collect from 07:51:23-08:22:09.
The next Aqua MODIS Lunar Calibration will be on DOY 2006/158 (June 7, 2006). The roll angle will be - 11.6949 degrees. Data collect will be from 04:20:08-04:26:38.
None
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
The FM1 MODIS instrument telemetry is trending nominally.
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
SRCA 10W Lamp #1: 250.5 of 500 hours
SRCA 10W Lamp #2: 188.0 of 500 hours
SRCA 10W Lamp #3: 205.7 of 500 hours
SRCA 10W Lamp #4: 84.8 of 500 hours
SRCA 1W Lamp #1: 510.7 of 5000 hours
SRCA 1W Lamp #2: 271.6 of 5000 hours
Solar Diffuser Door: 2510 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements
Email the MODIS IOT
to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster
to report any problem with the MCST Web Pages.
Email the MCST Helpdesk
to ask a question about Level 1B usage, algorithms or software.
Last Update: Friday, 07-Jul-2006 14:15:11 EDT