MODIS Support Teams Logo

MAIN PAGE

MODIS INFO

INSTRUMENT OPS


CALIBRATION

L1B PRODUCT INFO
& STATUS

CONTACTS & STAFF


ON-LINE DOCS

FREQUENTLY
ASKED QUESTIONS

SITE MAP

SEARCH

RELATED LINKS

MCST DICTIONARY


NASA/GSFC Website Privacy and Security Statement, Disclaimer, and Accessibility Certification


MODIS Web Organigram (Logo) - Click to Navigate Core MODIS-Related Web Sites

MODIS IOT Aqua Weekly Report

Mission Operations Days: 2003/305 through 2003/311
November 1, 2003 00:00:00 GMT to November 8, 2003 00:00:00 GMT


Aqua Spacecraft and MODIS Instrument Status:

PM-1 "Aqua" is in Fine Pointing Normal Mode
FM1 MODIS is in B-Side Nominal Science Mode
Component State(s) Comment
Blackbody A Off; B On (285K) Nominal Science Mode
Calibration ElectronicsA Off; B On Nominal Science Mode
Control Processor A Off; B On Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Closed Nominal Science Mode
FDDI Formatter A Off; B On Nominal Science Mode
FDDI Port A Off; B On Nominal Science Mode
FIFO Memory #1 & #2 Off; #3 & #4 OnNominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 Off, #2 On Nominal Science Mode
PV VIS FPA A Off; B On Nominal Science Mode
PV NIR FPA A Off; B On Nominal Science Mode
PV SMIR FPA A Off; B On Nominal Science Mode
PV LWIR FPA A Off; B On Nominal Science Mode
PC LWIR FPA A Off; B On Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater Off Nominal Science Mode
RC SMIR FPA Heater On (83K) Nominal Science Mode
Scan Assembly A Off; B On Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off Nominal Science Mode
PS1 Survival Heaters Enabled Nominal Science Mode
PS2 Survival Heaters Enabled Nominal Science Mode
Timing Generator A Off; B On Nominal Science Mode
Flight Software Rev BJ + 1 set of patches
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
Nominal Science Mode
Inhibit Ids Set None Nominal Science Mode

This Week's Completed MODIS Activities:

Saturday, November 1, 2003

None

Sunday, November 2, 2003

2003/306 01:00:00 MCL MOD_BB_TEMP_SET_270K_B.1 BB Temp Set to 270K for CP B Coefficients
2003/306 19:00:00 MCL MOD_BB_TEMP_SET_280K_B.1 BB Temp Set to 280K for CP B Coefficients
2003/306 23:00:00 MCL MOD_BB_TEMP_SET_285K_B.1 BB Temp Set to 285K for CP B Coefficients

Monday, November 3, 2003

2003/307 02:00:00 MCL MOD_BB_TEMP_SET_290K_B.1 BB Temp Set to 290K for CP B Coefficients
2003/307 06:00:00 MCL MOD_BB_TEMP_SET_315K_B.1 BB Temp Set to 315K for CP B Coefficients
2003/307 06:00:30 MCL MOD_BB_DCYCLE_FULL.1 BB Duty Cycle set to FULL
2003/307 10:00:00 MCL MOD_BB_TEMP_SET_270K_B.1 BB Temp Set to 270K for CP B Coefficients
2003/307 10:00:30 MCL MOD_BB_DCYCLE_THIRD.1 BB Duty Cycle set to THIRD

Tuesday, November 4, 2003

2003/308 06:00:00 MCL MOD_BB_TEMP_SET_285K_B.1 BB Temp Set to 285K for CP B Coefficients

MODIS Lunar Calibration Roll (-13.73 degrees):
2003/308 07:56:21 MCL MOD_OA03_FR_DAY_RATE.1 (NADIR Terminator Crossing to DAY + 00:00:00)
2003/308 08:42:35 MCL MOD_OA03_FR_NIGHT_RATE.2 (NADIR Terminator Crossing to NIGHT - 00:03:23)
2003/308 09:23:39-09:30:25 MCL MOD_OA08_ROLL_MAN.1
2003/308 09:23:39 MCL PM1_SCS_ISC_81_MOD_OA08_ROLL_MAN_START_V1
2003/308 09:23:49 FR RATE to DAY
2003/308 09:23:41 FR SCI Flag set to ABNORM
2003/308 09:23:43 FR PC DC Restore set to OFF
2003/308 09:23:45 FR PV DC Restore set to OFF
2003/308 09:23:47 FR Encoder Delta to -3072
2003/308 09:23:47-09:30:17 Lunar View through Space View Port
2003/308 09:30:17 MCL PM1_SCS_ISC_82_MOD_OA08_ROLL_MAN_END_V1
2003/308 09:30:17 FR Encoder Delta to 0
2003/308 09:30:19 FR PC DC Restore set to ON
2003/308 09:30:21 FR PV DC Restore set to ON
2003/308 09:30:23 FR SCI Flag set to NORM
2003/308 09:30:25 FR RATE to NIGHT
2003/308 09:38:36 MCL MOD_OA03_FR_DAY_RATE.1 (NADIR Terminator Crossing to DAY + 00:03:23)
2003/308 10:24:50 MCL MOD_OA03_FR_NIGHT_RATE.2 (NADIR Terminator Crossing to NIGHT + 00:00:00)

The MOD_OA03_FR_DAY/NIGHT_RATE.1/2 activities are scheduled to balance the FR Data Rate to 50%/50% Day/Night per orbit for the maneuver. They replace the two regularly scheduled activities, MOD_OA03_FR_DAY_NIGHT_SINGLE.1 (ISC SCS 56), at 2003/308 07:56:21 and 2003/308 09:35:13.

Wednesday, November 5, 2003

None

Thursday, November 6, 2003

None

Friday, November 7, 2003

None

This Week's Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Calibrations for November include bimonthly SRCA Full Spatial, monthly SRCA Full Radiometric, and biweekly SD/SDSM. An additional request has been made to repeat the full orbit SRCA Radiometric Continuous 10W and 1W collections that were performed on DOY 2003/029 and 2003/032. These have been scheduled to occur on DOY 2003/318 (see below).

Monday, November 10, 2003

2003/314 20:19:27-20:33:25 MCL MOD_OA16_SDSM_SCREEN.2 OA-16: SD/SDSM Screened - B Side
2003/314 21:15:00-21:15:16 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/314 21:19:12-21:53:24 MCL MOD_OA19_SRCA_FULL_RAD.1 OA-19: SRCA Full Radiometric Calibration - B Side Data Collect Centered on S/C Night (21:35:05-21:53:24)
2003/314 21:58:20-22:12:18 MCL MOD_OA15_SDSM_OPEN.1 OA-15: SD/SDSM Open - B Side

Friday, November 14, 2003

2003/318 00:51:12-00:51:28 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/318 00:52:18-02:57:35 MCL MOD_OA20_SRCA_10W_RAD.4 OA-20: SRCA 10W Radiometric (Continuous) Begins 15:54 prior to S/C Night, Orbit 8138 Data collection 01:08:12-02:57:35 (1 Orbit + 10:00)
2003/318 20:37:47-20:38:03 MCL MOD_SRCA_SETUP_NO_L2.2 SRCA setup activity using lamp #4 in lieu of lamp #2
2003/318 20:38:53-22:44:10 MCL MOD_OA21_SRCA_1W_RAD.2 OA-21: SRCA 1W Radiometric (Continuous) Begins 15:54 prior to S/C Night, Orbit 8150 Data collection 20:54:47-22:44:10 (1 Orbit + 10:00)

Maneuvers:

The Aqua MODIS Lunar Calibration Roll for November happened on DOY 2003/308 (November 4, 2003), at 09:23:47-09:30:17 GMT. The roll angle was be -13.73 degrees. The Aqua MODIS Lunar Calibration Roll for December is planned for DOY 2003/ 337 (December 3, 2003), at 18:40:00-18:46:30 GMT. The roll angle will be -2.2617 degrees.

Aqua performed a Drag Make-Up (DMU) Maneuver on DOY 2003/308 (Wednesday, November 5, 2003). The slew out time (and loss of pointing accuracy) was at 13:19 GMT. The burn occurred at 15:00 GMT and lasted for approximately 103 seconds. The slew return time was at 15:41 GMT, and point accuracy was regained at 15:56 GMT.

No official date has yet been scheduled for the Aqua Deep Space Calibration pitch maneuver(s).

MODIS Anomalies:

None

General Instrument Comments:

FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.

MODIS Telemetry Trends:

The FM1 MODIS instrument telemetry is trending nominally.

Non-MODIS Significant Events:

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/links/links.htm

Limited Life Item Status:

SRCA 10W Lamp #1: 225.5 of 500 hours
SRCA 10W Lamp #2: 184.3 of 500 hours
SRCA 10W Lamp #3: 192.9 of 500 hours
SRCA 10W Lamp #4: 64.2 of 500 hours

SRCA 1W Lamp #1: 504.4 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours

Solar Diffuser Door: 2122 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements


Responsible Civil Servant: Ed Masuoka

Email the MODIS IOT to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster to report any problem with the MCST Web Pages.
Email the MCST Helpdesk to ask a question about Level 1B usage, algorithms or software.

Last Update: Tuesday, 11-Nov-2003 18:27:27 EST



Valid XHTML 1.0! Valid CSS 2.0! Bobby WorldWide Approved 508 Lynx Viewer Confirmed Best Viewed With Any Browser