MAIN PAGEMODIS INFOINSTRUMENT OPSWeekly ReportsMODIS HistoryCALIBRATIONL1B PRODUCT INFO
|
MODIS IOT Aqua Weekly Report
Mission Operations Days: 2002/341 to 2002/347
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
PM-1 "Aqua" is in Fine Pointing Normal Mode FM1 MODIS is in B-Side Science Mode |
||
| Component | State(s) | Comment |
|---|---|---|
| Blackbody | A Off; B On | Science Mode |
| Calibration Electronics | A Off; B On | Science Mode |
| Control Processor | A Off; B On | Science Mode |
| Nadir Door | Unlatched, Open | Science Mode |
| Space View Door | Unlatched, Open | Science Mode |
| Solar Diffuser Door | Unlatched, Closed | Science Mode |
| FDDI Formatter | A Off; B On | Science Mode |
| FDDI Port | A Off; B On | Science Mode |
| FIFO Memory | #1 & #2 Off; #3 & #4 On | Science Mode |
| Format Processor | A Off; B On | Science Mode |
| Power Supplies | #1 Off, #2 On | Science Mode |
| PV VIS FPA | A Off; B On | Science Mode |
| PV NIR FPA | A Off; B On | Science Mode |
| PV SMIR FPA | A Off; B On | Science Mode |
| PV LWIR FPA | A Off; B On | Science Mode |
| PC LWIR FPA | A Off; B On | Science Mode |
| RC Outgas Heaters | All 3 (CS, IS, OS) Off | Science Mode |
| RC LWIR FPA Heater | Off | Science Mode |
| RC SMIR FPA Heater | On | Science Mode |
| Scan Assembly | A Off; B On | Science Mode |
| SDSM | Off | Science Mode |
| SRCA | Off | Science Mode |
| PS1 Survival Heaters | Enabled | Science Mode |
| PS2 Survival Heaters | Enabled | Science Mode |
| Timing Generator | A Off; B On | Science Mode |
| Flight Software | Rev BJ | Science Mode |
| Inhibit Ids Set | None | Science Mode |
None
Sunday, December 8, 2002None
Monday, December 9, 2002
2002/343 15:21:26 – 15:35:24 MCL MOD_OA16_SDSM_SCREEN.2
OA16: SDSM Calibration with SD Screened - B Side
2002/343 17:00:19 – 17:14:17 MCL MOD_OA15_SDSM_OPEN.1
OA15: SDSM Calibration with SD Open - B Side
None
Wednesday, December 11, 2002None
Thursday, December 12, 2002None
Friday, December 13, 2002None
None
2002/348 20:47:00 MCL MOD_OA03_FR_DAY_RATE.1
2002/348 21:33:15 MCL MOD_OA03_FR_NIGHT_RATE.2 - 3:23 early for data balance
2002/348 22:04:29-22:11:15 MCL MOD_OA08_ROLL_MAN.1
2002/348 22:29:16 MCL MOD_OA03_FR_DAY_RATE.1 - 3:23 late for data balance
2002/348 23:15:31 MCL MOD_OA03_FR_NIGHT_RATE.2
2002/350 20:24:08-20:38:06 MCL MOD_OA16_SDSM_SCREEN.2
OA-16: SD/SDSM Screened - B Side
2002/350 22:03:01-22:16:59 MCL MOD_OA15_SDSM_OPEN.1
OA-15: SD/SDSM Opened - B Side
December calibrations include weekly SD/SDSM events, an SRCA Full Radiometric, and a PV Electronics Calibration.
SRCA activities are being developed to measure detector cross talk and will be performed in the near future.
The next Aqua MODIS Lunar Calibration via roll maneuver will be on December 14th, 2002 (2002/348). The roll angle will be -1.4207 degrees and the data collection period will be from 22:04:40 to 22:11:10 GMT.
The Deep Space Calibration pitch maneuver(s) have been indefinitely suspended pending mission review.
The Aqua drag make-up maneuver executed on Thursday, December 12th, 2002 (2002/346). The loss/regain times of pointing accuracy from the maneuver were 2002/346 14:49 to 2002/346 16:29, respectively.
On November 7, 2002 (DOY 2002/311), a final patch to the BST was outlined. The two MODIS command slots in the BST that are currently switched will be returned to their original locations. At the same time, the command slots will be given a one sub-minor cycle delay. This will result in the command slots having the desired delay period between themselves, and the bus signals that are believed to have caused the occasional problems with MODIS receiving commands.
A software patch review meeting was held on Friday, December 6th to discuss the testing of the next BST patch. The Aqua FOT and the MODIS IOT will be testing the patch during the week of December 9th.
FM1 MODIS is in Science Mode. The SVD and NAD are Open, the survival heaters are enabled, and the Black Body is heated to 285 K.
The FM1 MODIS instrument telemetry is trending nominally. A slight increase in the radiative cooler intermediate stage temperature has been observed along with a decrease in the focal plane heater power usage. These telemetry points will be closely monitored for additional changes over the next several weeks.
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links webpages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
SRCA 10W Lamp #1: 209.9 of 500 hours
SRCA 10W Lamp #2: 181.7 of 500 hours
SRCA 10W Lamp #3: 184.5 of 500 hours
SRCA 10W Lamp #4: 57.7 of 500 hours
SRCA 1W Lamp #1: 501.0 of 5000 hours
SRCA 1W Lamp #2: 269.8 of 5000 hours
Solar Diffuser Door: 1888 of 3022 Movements
Nadir Aperture Door: 1053 of 1316 Movements
Space View Door: 632 of 1316 Movements
Email the MODIS IOT
to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster
to report any problem with the MCST Web Pages.
Email the MCST Helpdesk
to ask a question about Level 1B usage, algorithms or software.
Last Update: Friday, 18-Apr-2003 14:30:35 EDT