Mission Operations Days: 2006/196 through 2006/202
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
AM-1 "Terra" is in Normal Mode PFM MODIS is in A-Side Nominal Science Mode (Cross Strapped with FR B) |
||
| Component | State(s) | Comment |
|---|---|---|
| Blackbody | A On (290K); B Off | Nominal Science Mode |
| Calibration Electronics | A On; B Off | Nominal Science Mode |
| Control Processor | A On; B Off | Nominal Science Mode |
| Nadir Door | Unlatched, Open | Nominal Science Mode |
| Space View Door | Unlatched, Open | Nominal Science Mode |
| Solar Diffuser Door | Unlatched, Screened | Permanent Configuration |
| FDDI Formatter | A On; B Off | Nominal Science Mode |
| FDDI Port | A On; B Off | Nominal Science Mode |
| FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal Science Mode |
| Format Processor | A Off; B On | Nominal Science Mode |
| Power Supplies | #1 On, #2 Off | Nominal Science Mode |
| PV VIS FPA | A On; B Off | Nominal Science Mode |
| PV NIR FPA | A On; B Off | Nominal Science Mode |
| PV SMIR FPA | A On; B Off | Nominal Science Mode |
| PV LWIR FPA | A On; B Off | Nominal Science Mode |
| PC LWIR FPA | A On; B Off | Nominal Science Mode |
| RC Outgas Heaters | All 3 (CS, IS, OS) Off | Nominal Science Mode |
| RC LWIR FPA Heater | On (83K) | Nominal Science Mode |
| RC SMIR FPA Heater | Off | Nominal Science Mode |
| Scan Assembly | A On; B Off | Nominal Science Mode |
| SDSM | Off | Nominal Science Mode |
| SRCA | Off
| Nominal Science Mode |
| PS1 Survival Heater | Enabled | Nominal Science Mode |
| PS2 Survival Heater | Enabled | Nominal Science Mode |
| Timing Generator | A On; B Off | Nominal Science Mode |
| Flight Software | Rev BD + 11 sets of patches
| Nominal Science Mode |
| Inhibit Ids Set | none | Nominal Science Mode |
| TMON 66 | Disabled | Nominal Science Mode |
| TMON 67 | Disabled | Nominal Science Mode |
| TMON 68 | Enabled | Nominal Science Mode |
| TMON 69 | Disabled | Nominal Science Mode |
Lunar Roll Maneuver (-8.6125 deg roll)
2006/196 03:17:30-03:35:38 ATC MOD_OA03_FR_NIGHT_RATE (03:23 early)
2006/196 03:35:38-03:42:24 ATC MOD_OA08_ROLL_MAN
2006/196 04:13:36-04:59:47 ATC MOD_OA03_FR_DAY_RATE (03:23 late)
None
Monday, July 17, 2006None
Tuesday, July 18, 2006None
Wednesday, July 19, 20062006/200 02:10:55-02:13:26 ATC MOD_OA27_PV_ECAL.3
OA-27: Photovoltaic bands electronics calibration.
2006/200 21:00:00 ATC MOD_OA26_BB_270K_A.2
Set blackbody temperature to 270K on the A Side
2006/201 15:00:00 ATC MOD_OA26_BB_280K_A.2
Set blackbody temperature to 280K on the A Side
2006/201 19:00:00 ATC MOD_OA26_BB_285K_A.2
Set blackbody temperature to 285K on the A Side
2006/201 22:00:00 ATC MOD_OA26_BB_290K_A.2
Set blackbody temperature to 290K on the A Side
2006/202 02:00:00 ATC MOD_OA26_BB_315K_A.2
Set blackbody temperature to 315K on the A Side
2006/202 02:00:30 ATC MOD_OA26_BB_DCYCLE_FULL.1
Set blackbody heater duty cycle to FULL
2006/202 05:00:00 ATC MOD_OA26_BB_270K_A.2
Set blackbody temperature to 270K on the A Side
2006/202 05:00:30 ATC MOD_OA26_BB_DCYCLE_THIRD.1
Set blackbody heater duty cycle to THIRD
None
Calibrations for July will include biweekly SDSM.
Saturday, July 22, 20062006/203 02:00:00 ATC MOD_OA26_BB_290K_A.2 Set blackbody temperature to 290K on the A Side
Tuesday, July 25, 20062006/206 21:08:58-21:17:46 ATC MOD_OA16_SDSM_SCRN_NO_DOOR_A.4 OA-16: SD/SDSM screened side A, no door movement.
The next Terra MODIS Lunar Calibration Roll will be on DOY 2006/225 (August 13, 2006). The roll angle will be -6.5870 degrees. Data collect will be from 08:14:49- 08:21:19.
None
MODIS is in Science Mode, using all A-side components, but cross-strapped to Formatter B, with the blackbody maintained at 290K and the Solar Diffuser Door at the Screened position.
Nominal telemetry trending is ongoing.
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htm
SRCA 10W Lamp #1: 253.7 of 500 hours
SRCA 10W Lamp #2: 172.1 of 500 hours
SRCA 10W Lamp #3: 190.3 of 500 hours
SRCA 10W Lamp #4: 80.2 of 500 hours
SRCA 1W Lamp #1: 570.1 of 4000 hours
SRCA 1W Lamp #2: 278.7 of 4000 hours
Solar Diffuser Door: 2146 of 3022 Movements
Nadir Aperture Door: 538 of 1316 Movements
Space View Door: 441 of 1316 Movements
Email the MODIS IOT
to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster
to report any problem with the MCST Web Pages.
Email the MCST Helpdesk
to ask a question about Level 1B usage, algorithms or software.
Last Update: Wednesday, 26-Jul-2006 16:54:36 EDT