MODIS IOT Terra Weekly Report

Mission Operations Days: 2004/283 through 2004/289
October 8, 2004, 20:00:00 GMT to October 15, 2004 20:00:00 GMT


Terra Spacecraft and MODIS Instrument Status:

AM-1 "Terra" is in Normal Mode
PFM MODIS is in A-Side Nominal Science Mode
(Cross Strapped with FR B)
Component State(s) Comment
Blackbody A On (290K); B Off Nominal Science Mode
Calibration ElectronicsA On; B Off Nominal Science Mode
Control Processor A On; B Off Nominal Science Mode
Nadir Door Unlatched, Open Nominal Science Mode
Space View Door Unlatched, Open Nominal Science Mode
Solar Diffuser Door Unlatched, Screened Permanent Configuration
FDDI Formatter A On; B Off Nominal Science Mode
FDDI Port A On; B Off Nominal Science Mode
FIFO Memory #1 & #2 On; #3 & #4 OffNominal Science Mode
Format Processor A Off; B On Nominal Science Mode
Power Supplies #1 On, #2 Off Nominal Science Mode
PV VIS FPA A On; B Off Nominal Science Mode
PV NIR FPA A On; B Off Nominal Science Mode
PV SMIR FPA A On; B Off Nominal Science Mode
PV LWIR FPA A On; B Off Nominal Science Mode
PC LWIR FPA A On; B Off Nominal Science Mode
RC Outgas Heaters All 3 (CS, IS, OS) Off Nominal Science Mode
RC LWIR FPA Heater On (83K) Nominal Science Mode
RC SMIR FPA Heater Off Nominal Science Mode
Scan Assembly A On; B Off Nominal Science Mode
SDSM Off Nominal Science Mode
SRCA Off Nominal Science Mode
PS1 Survival Heater Enabled Nominal Science Mode
PS2 Survival Heater Enabled Nominal Science Mode
Timing Generator A On; B Off Nominal Science Mode
Flight Software Rev BD + 11 sets of patches
  • CP07 to Survival Mode - No SDD to closed command (1 patch)
  • CP07 to Safe Mode - No FR OFF Command (1 patch)
  • CP07 to Safe Mode - No SDD to closed command (1 patch)
  • CP07 to Science Mode - Turn on FRB instead of FRA (1 patch)
  • CP07 to Outgas and Science Mode - Turn on FRB instead of FRA (1 patch)
  • FR Error Counting and Statistics (2 patches)
  • FR 1000ms time code patches (3 patches)
  • FR Band 5 Gain Change (20 commands)
  • FR BB Ideal Output Values (1 patch)
  • FR A EEPROM KME Fast 1 word patch (1 patch)
  • FR B EEPROM KME Fast 1 word patch (1 patch)
Nominal Science Mode
Inhibit Ids Set none Nominal Science Mode
TMON 66 Disabled Nominal Science Mode
TMON 67 Disabled Nominal Science Mode
TMON 68 Enabled Nominal Science Mode
TMON 69 Disabled Nominal Science Mode

This Week’s Completed MODIS Activities:

Saturday, October 9, 2004

None

Sunday, October 10, 2004

None

Monday, October 11, 2004

None

Tuesday, October 12, 2004

2004/286 20:50:39-20:53:10 ATC MOD_OA27_PV_ECAL.3 OA-27: Photovoltaic bands electronics calibration
2004/286 21:34:49-21:43:37 ATC MOD_OA16_SDSM_SCRN_NO_DOOR_A.4 OA-16: SD/SDSM screened side A, no door movement.
2004/286 22:30:00-22:30:31 ATC MOD_SRCA_11_3_8_2_SETUP.1 SRCA setup activity using lamp #4 in lieu of lamp #2
2004/286 22:31:30-23:06:39 ATC MOD_OA19_SRCA_FULL_RAD_A.6 OA-19: SRCA Full Radiometric Calibration.
Data collection from 22:47:23-23:06:39

Wednesday, October 13, 2004

None

Thursday, October 14, 2004

None

Friday, October 15, 2004

None

This Week’s Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Calibrations for October will include biweekly SDSM, monthly SRCA 10W Radiometric, quarterly SRCA Full Spatial, and quarterly Blackbody.

A request by MCST has been made to perform SRCA 10W and 1W continuous mode Radiometric observations. These activities will be coordinated for the second half of October. These tests will be similar to the ones perform in October 2003.

Maneuvers:

The November Lunar Calibration Roll will be on day 2004/307 (November 2, 2004). Data collect will be from 00:22:22- 00:28:52 GMT with a roll angle of -14.1615 degrees.

The Terra FOT is planning for 3 Inclination Adjust Maneuvers (IAMs). The planned dates are October 26, October 28, and November 3 (2004/300, 2004/302, and 2004/308, respectively). The maneuvers will occur at approximately 15:00 GMT on each of those days.

MODIS Anomalies:

MODIS NAD (Nadir Aperture Door) Anomaly:

Telemetry still indicates that the “NAD Open” (MOD_CR_DR_NAD_OPEN) trigger is set to the “NOT_OPEN” position; however, science data has shown that the NAD is open. The NAD OPEN trigger may yet “pop” to OPEN due to thermal cycling on the trigger, as was seen on 2002/079.

General Instrument Comments:

MODIS is in Science Mode, using all A-side components, but cross-strapped to Formatter B, with the blackbody maintained at 290K and the Solar Diffuser Door at the Screened position.

MODIS Telemetry Trends:

Nominal telemetry trending is ongoing.

Non-MODIS Significant Events:

Terra Solid State Recorder Anomaly

Overview:

The SSR Anomaly is still under investigation. MODIS currently is operating with 34 Supersets allotted for its buffer. There are plans in the works for possibly power cycling the SSR to get back PWA’s that are in the Bad List, but no date has yet been set. There are no current plans for a change in science data capture rates. For details, see previous report am1weekly_2003-305_2003-311.doc. The Terra FOT is currently evaluating plans to perform a power recycling of the SSR in an attempt to regain functionality of the “bad” PWAs. This activity will be performed at a time when it is least detrimental to critical science data.

The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.

http://jupiter02.gsfc.nasa.gov/links/links.htm

Limited Life Item Status:

SRCA 10W Lamp #1: 234.9 of 500 hours
SRCA 10W Lamp #2: 168.7 of 500 hours
SRCA 10W Lamp #3: 180.9 of 500 hours
SRCA 10W Lamp #4: 65.5 of 500 hours

SRCA 1W Lamp #1: 566.9 of 4000 hours
SRCA 1W Lamp #2: 276.9 of 4000 hours

Solar Diffuser Door: 2146 of 3022 Movements
Nadir Aperture Door: 538 of 1316 Movements
Space View Door: 441 of 1316 Movements


Responsible Civil Servant: Ed Masuoka

Email the MODIS IOT to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster to report any problem with the MCST Web Pages.
Email the MCST Helpdesk to ask a question about Level 1B usage, algorithms or software.

Last Update: Thursday, 21-Oct-2004 09:24:15 EDT



Valid XHTML 1.0! Valid CSS 2.0! Bobby WorldWide Approved 508 Lynx Viewer Confirmed Best Viewed With Any Browser