MODIS IOT Terra Weekly Report
Mission Operations Days: 2002/348 to 2002/354
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
AM-1 "Terra" is in Normal Mode PFM MODIS is in A-Side Science Mode (Cross Strapped with FR B) |
||
| Component | State(s) | Comment |
|---|---|---|
| Blackbody | A On (290 K); B Off | Nominal Science Mode |
| Calibration Electronics | A On; B Off | Nominal Science Mode |
| Control Processor | A On; B Off | Nominal Science Mode |
| Nadir Door | Unlatched, Open | Nominal Science Mode |
| Space View Door | Unlatched, Open | Nominal Science Mode |
| Solar Diffuser Door | Unlatched, Closed | Nominal Science Mode |
| FDDI Formatter | A On; B Off | Nominal Science Mode |
| FDDI Port | A On; B Off | Nominal Science Mode |
| FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal Science Mode |
| Format Processor | A Off; B On | Nominal Science Mode |
| Power Supplies | #1 On, #2 Off | Nominal Science Mode |
| PV VIS FPA | A On; B Off | Nominal Science Mode |
| PV NIR FPA | A On; B Off | Nominal Science Mode |
| PV SMIR FPA | A On; B Off | Nominal Science Mode |
| PV LWIR FPA | A On; B Off | Nominal Science Mode |
| PC LWIR FPA | A On; B Off | Nominal Science Mode |
| RC Outgas Heaters | All Off (CS, IS, OS) | Nominal Science Mode |
| RC LWIR FPA Heater | On (83 K) | Nominal Science Mode |
| RC SMIR FPA Heater | Off | Nominal Science Mode |
| Scan Assembly | A On; B Off | Nominal Science Mode |
| SDSM | Off | Nominal Science Mode |
| SRCA | Off | Nominal Science Mode |
| PS1 Survival Heater | Enabled | Nominal Science Mode |
| PS2 Survival Heater | Enabled | Nominal Science Mode |
| Timing Generator | A On; B Off | Nominal Science Mode |
| Flight Software | Rev BD + 9 sets of patches
| Nominal Science Mode |
| Inhibit Ids Set | none | Nominal Science Mode |
| TMON 66 | Disabled | Nominal Science Mode |
| TMON 67 | Disabled | Nominal Science Mode |
| TMON 68 | Enabled | Nominal Science Mode |
| TMON 69 | Disabled | Nominal Science Mode |
None
Sunday, December 15, 2002None
Monday, December 16, 2002
2002/350 21:02:00-21:15:11 ATC MOD_OA16_SD_SCREEN_FXD_SUN_A.1
OA-16: SD/SDSM Screened - SDSM Fixed at SUN View - A Side
2002/350 22:40:53-22:54:04 ATC MOD_OA15_SD_OPEN_FIXED_SD_A.1
OA-15: SD/SDSM Opened - SDSM Fixed at SD View - A Side
None
Wednesday, December 18, 2002None
Thursday, December 19, 2002None
Friday, December 20, 2002None
None
December calibrations will include bi-weekly SD/SDSM events, an SRCA Full Radiometric, and a PV Electronics Calibration.
Two new SRCA calibrations will be performed in the near future; one of these new activities will use the “backup” lamps in the SRCA Spherical Integrating Source (SIS) for the first time on orbit.
The next Terra MODIS Lunar Calibration via roll maneuver will be on December 24th, 2002 (2002/358). The roll angle will be -3.3484 degrees and the data collection period will be from 06:50:16 to 06:56:46 GMT.
The next Terra drag make-up maneuver is being planned for December 18th, 2002.
An additional set of 2 days of six yaw maneuvers each day to facilitate SD/SDSM “Screened” calibrations is being scheduled for January 8-9, 2002.
The Terra Deep Space Calibration Maneuver is still postponed.
None
MODIS is in Science Mode, using all A-side components, but cross-strapped to Formatter B, with the blackbody maintained at 290K.
Nominal telemetry tracking is taking place. A slight increase in the radiative cooler intermediate stage temperature has been observed along with a decrease in the focal plane heater power usage. These telemetry points will be closely monitored for additional changes over the next several weeks.
The EMOS mission status webpage (which includes instrument data loss records) can be found at the following URL. Note that a password is now required to access the EOS mission links web pages. There are directions at the URL below for how to obtain a username/password.
http://jupiter02.gsfc.nasa.gov/links/links.htmNote: The lamp hours and door uses have been recomputed based on a detailed review of early on-orbit activities. Some values have changed slightly.
SRCA 10W Lamp #1: 204.8 of 500 hours
SRCA 10W Lamp #2: 155.3 of 500 hours
SRCA 10W Lamp #3: 164.5 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours
SRCA 1W Lamp #1: 560.6 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours
Solar Diffuser Door: 2043 of 3022 Movements
Nadir Aperture Door: 536 of 1316 Movements
Space View Door: 439 of 1316 Movements
Email the MODIS IOT
to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster
to report any problem with the MCST Web Pages.
Email the MCST Helpdesk
to ask a question about Level 1B usage, algorithms or software.
Last Update: Thursday, 27-Feb-2003 13:46:12 EST