MODIS IOT Terra Weekly Report
Mission Operations Days: 2002/159 to 2002/165
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Terra (AM-1) is in Normal Mode MODIS is in A-side Science Mode |
||
| Component | State(s) | Comment |
|---|---|---|
| Blackbody | A On (290 K); B Off | Nominal |
| Calibration Electronics | A On; B Off | Nominal |
| Control Processor | A On; B Off | Nominal |
| Nadir Door | Unlatched, Open | Nominal |
| Space View Door | Unlatched, Open | Nominal |
| Solar Diffuser Door | Unlatched, Closed | Nominal |
| FDDI Formatter | A On; B Off | Nominal |
| FDDI Port | A On; B Off | Nominal |
| FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal |
| Format Processor | A On; B Off | Nominal |
| Power Supplies | #1 On, #2 Off | Nominal |
| PV VIS FPA | A On; B Off | Nominal |
| PV NIR FPA | A On; B Off | Nominal |
| PV SMIR FPA | A On; B Off | Nominal |
| PV LWIR FPA | A On; B Off | Nominal |
| PC LWIR FPA | A On; B Off | Nominal |
| RC Outgas Heaters | All Off (CS, IS, OS) | Nominal |
| RC LWIR FPA Heater | On (83 K) | Nominal |
| RC SMIR FPA Heater | Off | Nominal |
| Scan Assembly | A On; B Off | Nominal |
| SDSM | Off | Nominal |
| SRCA | Off | Nominal |
| PS1 Survival Heater | Enabled | Nominal |
| PS2 Survival Heater | Enabled | Nominal |
| Timing Generator | A On; B Off | Nominal |
| Flight Software | Rev BD + 6 sets of patches
| Nominal |
| Inhibit Ids Set | None | Nominal |
| TMON 66 | Disabled | Nominal |
| TMON 67 | Disabled | Nominal |
| TMON 68 | Enabled | Nominal |
| TMON 69 | Disabled | Nominal |
None
Sunday, June 9, 2002None
Monday, June 10, 2002None
Tuesday, June 11, 2002None
Wednesday, June 12, 20022002/163 20:04:22 Real-time MOD_MEM_HALT to clear xx1B formatter last event message
Thursday, June 13, 2002None
Friday, June 14, 2002None
None
SD/SDSM calibrations June 19th, SRCA full radiometric June 19th, PV Ecal June 20th.
The next MODIS Lunar Calibration will be on June 29, 2002 (DOY 2002/180). The roll angle for this activity will be -15.6745 degrees.
The sixth Terra inclination maneuver has been postponed (originally scheduled for 4/2/2002). The new date for the maneuver is not yet known. The maneuver will only be done if it does not interfere with any Aqua spacecraft launch activities.
The Terra Deep Space Calibration Maneuver is still postponed. The maneuver date is not expected until late summer of 2002.
The current patches loaded into the MODIS Formatter record the number of formatter error events (but not the address where they occurred). The error rate has continued to increase significantly with over 3 million errors occurring on day 165. A patch is being considered to nullify the address which had previously accounted for over 80% of the formatter errors.
Intermittent bad frame count formatter event messages (xx1B) are being observed. This is one of the event messages being used to warn of potential impacts to the science data. The MODIS halt memory transfer command is being sent after each 1B event message. This command triggers both a CP and FR event message and thus "clears" the current MOD_SS_FR_LAST_EVENT message of the xx1B value.
The most recent error tracking spreadsheets can be retrieved from:
ftp://ftp.mcst.ssai.biz/pub/permanent/IOT/am1/analysis/FR_events/An MS Excel spreadsheet called, AM1_FR_error_rollovers_current.xls contains the data for the times each error count "roll over" occurs.
MODIS is in A-side Science Mode with the blackbody maintained at 290K.
All systems appear to be functioning properly. Tracking of the Formatter Error Rate is continuing.
Science Data Loss Reports can be viewed at:
http://jupiter02.gsfc.nasa.gov:591/ssrloss/Select "Search Data Losses" and choose Data Type: MOD
Then press the big SUBMIT button.
SRCA 10W Lamp #1: 200.5 of 500 hours
SRCA 10W Lamp #2: 152.4 of 500 hours
SRCA 10W Lamp #3: 161.6 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours
SRCA 1W Lamp #1: 559.6 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours
Solar Diffuser Door: 1865 of 3022 Movements
Nadir Aperture Door: 536 of 1316 Movements
Space View Door: 439 of 1316 Movements
Email the MODIS IOT
to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster
to report any problem with the MCST Web Pages.
Email the MCST Helpdesk
to ask a question about Level 1B usage, algorithms or software.
Last Update: Thursday, 04-Sep-2003 18:14:23 EDT