MODIS Support Teams Logo

MAIN PAGE

MODIS INFO

INSTRUMENT OPS


CALIBRATION

L1B PRODUCT INFO
& STATUS

CONTACTS & STAFF


ON-LINE DOCS

FREQUENTLY
ASKED QUESTIONS

SITE MAP

SEARCH

RELATED LINKS

MCST DICTIONARY


NASA/GSFC Website Privacy and Security Statement, Disclaimer, and Accessibility Certification


MODIS Web Organigram (Logo) - Click to Navigate Core MODIS-Related Web Sites

MODIS IOT Terra Weekly Report

Mission Operations Days: 2002/124 to 2002/130
May 3, 2002 20:00:00 GMT to May 10, 2002 20:00:00 GMT


The Formatter A EEPROM was successfully patched.

Terra Spacecraft and MODIS Instrument Status:

AM-1 "Terra" is in Normal Mode
PFM MODIS is in A-Side Science Mode
Component State(s) Comment
Blackbody A On (290 K); B Off Nominal
Calibration ElectronicsA On; B Off Nominal
Control Processor A On; B Off Nominal
Nadir Door Unlatched, Open Nominal
Space View Door Unlatched, Open Nominal
Solar Diffuser Door Unlatched, Closed Nominal
FDDI Formatter A On; B Off Nominal
FDDI Port A On; B Off Nominal
FIFO Memory #1 & #2 On; #3 & #4 OffNominal
Format Processor A On; B Off Nominal
Power Supplies #1 On, #2 Off Nominal
PV VIS FPA A On; B Off Nominal
PV NIR FPA A On; B Off Nominal
PV SMIR FPA A On; B Off Nominal
PV LWIR FPA A On; B Off Nominal
PC LWIR FPA A On; B Off Nominal
RC Outgas Heaters All Off (CS, IS, OS) Nominal
RC LWIR FPA Heater On (83 K) Nominal
RC SMIR FPA Heater Off Nominal
Scan Assembly A On; B Off Nominal
SDSM Off Nominal
SRCA Off Nominal
PS1 Survival Heater Enabled Nominal
PS2 Survival Heater Enabled Nominal
Timing Generator A On; B Off Nominal
Flight Software Rev BD + 6 sets of patches
  • CP to Safe - No FR Off (1 patch)
  • FR Error Counting (2 patches)
  • FR 1000ms time code patches (3 patches)
  • FR Band 5 Gain Change (20 commands)
  • FR BB Ideal Output Values (1 patch)
  • FR A EEPROM KME Fast 1 word patch (1 patch)
Nominal
Inhibit Ids Set None Nominal
TMON 66 Disabled Nominal
TMON 67 Disabled Nominal
TMON 68 Enabled Nominal
TMON 69 Disabled Nominal

This Week's Completed MODIS Activities:

Saturday, May 4, 2002

None

Sunday, May 5, 2002

None

Monday, May 6, 2002

None

Tuesday, May 7, 2002

None

Wednesday, May 8, 2002

Patch to MODIS EEPROM
Dumping memory in preparation for EEPROM memory load patch

2002/128 12:47:01 - 12:47:36 Real-Time Memory dump of FR ROM CRC
2002/128 12:47:59 - 12:48:37 Real-Time Memory dump of FR physical memory
2002/128 12:49:22 - 12:49:55 Real-Time Memory dump of FR Instruction memory
2002/128 12:50:16 - 12:50:30 Real-Time Performed a memory dump halt as a No-Op command.

Drag Makeup Maneuver

2002/128 18:08:00 Spacecraft to low fidelity pointing
2002/128 18:58:00 Real-Time Spacecraft performs a 25 second drag makeup burn
2002/128 20:29:00 Spacecraft to high fidelity pointing.

EEPROM load

2002/128 21:11:21 - 21:13:36 Real-Time Load 1 word memory patch to the EEPROM
2002/128 21:15:07 - 21:15:40 Real-Time Memory dump of the 1 word EEPROM patch for verification.

Thursday, May 9, 2002

2002/129 00:37:18 - 00:37:49 Real-Time Memory dump of FR ROM CRC for EEPROM verification.
2002/129 21:24:45 ATC OA16: SDSM SCREENED Fixed Sun view, side A
2002/129 23:03:38 ATC OA15: SDSM OPEN Fixed SD view, side A

Friday, May 10, 2002

None

This Week's Scheduled MODIS Activities Not Completed:

None

Upcoming MODIS Events:

Wednesday, May 15, 2002

135/21:34:59 - 22:32:30 ATC OA23: SRCA Full Spatial, side A.

Upcoming calibrations for the month of May include an SRCA Full Radiometric and bi-weekly SD/SDSM calibrations.

Maneuvers:

The next possible MODIS Lunar Calibration will be towards the end of May.

The sixth Terra inclination maneuver has been postponed (originally scheduled for 4/2/2002). The new date for the maneuver is not yet known. The maneuver will only be done if it does not interfere with any Aqua spacecraft launch and activation activities.

The Terra Deep Space Calibration Maneuver is still postponed. The maneuver date is not expected until late summer of 2002.

MODIS Anomalies:

On day of year 128 at 21:11, the formatter EEPROM was loaded with a one word patch. In the event that the formatter is shut down, upon restart, this patch will prevent the formatter from resetting due to the error events.

Formatter Error Events:

The current patches loaded into the MODIS Formatter record the number of formatter error events (but not the address where they occurred). The error rate has increased slightly since the instrument safe mode recovery with up to 200,000 errors occurring per day. For data on the error events, please see the link below.

The most recent error tracking spreadsheets can be retrieved from:

ftp://ftp.mcst.ssai.biz/pub/permanent/IOT/am1/analysis/FR_events/

An MS Excel spreadsheet called, AM1_FR_error_rollovers_current.xls contains the data for the times each error count 'roll over' occurs.

General Instrument Comments:

MODIS is in A-side Science Mode.

MODIS Telemetry Trends:

All systems appear to be functioning properly. Tracking of the Formatter Error Rate has resumed.

Non-MODIS Significant Events:

Science Data Loss Reports can be viewed at:

http://jupiter02.gsfc.nasa.gov:591/ssrloss/

Select "Search Data Losses" and choose Data Type: MOD

Then press the big SUBMIT button.

Limited Life Item Status:

SRCA 10W Lamp #1: 200.0 of 500 hours
SRCA 10W Lamp #2: 151.9 of 500 hours
SRCA 10W Lamp #3: 161.1 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours

SRCA 1W Lamp #1: 559.3 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours

Solar Diffuser Door: 1853 of 3022 Movements
Nadir Aperture Door: 536 of 1316 Movements
Space View Door: 439 of 1316 Movements


Responsible Civil Servant: Ed Masuoka

Email the MODIS IOT to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster to report any problem with the MCST Web Pages.
Email the MCST Helpdesk to ask a question about Level 1B usage, algorithms or software.

Last Update: Thursday, 04-Sep-2003 18:14:23 EDT



Valid XHTML 1.0! Valid CSS 2.0! Bobby WorldWide Approved 508 Lynx Viewer Confirmed Best Viewed With Any Browser