MAIN PAGEMODIS INFOINSTRUMENT OPSWeekly ReportsMODIS HistoryCALIBRATIONL1B PRODUCT INFO
|
MODIS IOT Terra Weekly Report
Mission Operations Days: 2001/293 to 2001/299
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Terra (AM-1) is in Normal Ops Mode MODIS is in Science Mode - A Side |
||
| Component | State(s) | Comment |
|---|---|---|
| Blackbody | A On (290 K); B Off | Nominal |
| Calibration Electronics | A On; B Off | Nominal |
| Control Processor | A On; B Off | Nominal |
| Nadir Door | Unlatched, Open | Nominal |
| Space View Door | Unlatched, Open | Nominal |
| Solar Diffuser Door | Unlatched, Closed | Nominal |
| FDDI Formatter | A On; B Off | Nominal |
| FDDI Port | A On; B Off | Nominal |
| FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal |
| Format Processor | A On; B Off | Nominal |
| Power Supplies | #1 On; #2 Off | Nominal |
| PV VIS FPA | A On; B Off | Nominal |
| PV NIR FPA | A On; B Off | Nominal |
| PV SMIR FPA | A On; B Off | Nominal |
| PV LWIR FPA | A On; B Off | Nominal |
| PC LWIR FPA | A On; B Off | Nominal |
| RC Outgas Heaters | All Off (CS, IS, OS) | Nominal |
| RC LWIR FPA Heater | On (83 K) | Nominal |
| RC SMIR FPA Heater | Off | Nominal |
| Scan Assembly | A On; B Off | Nominal |
| SDSM | A Off; B Off | Nominal |
| SRCA | A Off; B Off | Nominal |
| PS1 Survival Heater | Enabled | Nominal |
| PS2 Survival Heater | Enabled | Nominal |
| Timing Generator | A Off; B On | Nominal |
| Flight Software | Rev BD + 3 set of patches
| Nominal |
| Inhibit Ids Set | None | Nominal |
| TMON 66 (SRCA A) | Disabled | Nominal |
| TMON 67 (SRCA B) | Disabled | Nominal |
| TMON 68 (FIFO) | Enabled | Nominal |
| TMON 69 (EPS Current) | Disabled | Nominal |
2001/293 05:00:00 ATC OA26: BB Temperature Stepping (BB to 290K)
Sunday, October 21, 2001None
Monday, October 22, 2001None
Tuesday, October 23, 2001None
Wednesday, October 24, 2001
2001/297 21:14:48-21:26:16 ATC OA15: SD/SDSM Open
2001/297 22:53:41-23:05:09 ATC OA16: SD/SDSM Screened
None
Friday, October 26, 2001None
None
Two SD/SDSM calibrations will be scheduled during the upcoming week.
The next Drag Makeup Maneuver will occur on 2001/303 (October 30, 2001) at 19:32:00.
The next Lunar Calibration roll maneuver is scheduled for day 2001/309 (November 5, 2001) with data collection from 18:15:11 to 18:21:41 (Space Craft roll time of 18:09:07 to 18:26:50). The roll angle will be -11.8237 degrees.
The topics of Terra's orbit inclination adjust maneuvers and eventual equator crossing time has resurfaced. Terra's equator crossing mean local time (MLT) requirement is 10:30 +/- 00:15. The current crossing time is about 10:35 and decreasing by 1-2 seconds per day. The orbit management talks have begun because, under current conditions, Terra will approach the SAC-C spacecraft very closely in April of 2002. Further details will follow as a finalized plan emerges.
Formatter Error Events:
As of 2001/299, 15:34:30, the FR error counter (MOD_SS_CP_STATUS_08) has “rolled over” 43 times since the A-Side restart following the PS-2 Anomaly, and 41 times since the latest string of errors started on August 15. This is a 16-bit signed counter, therefore it “rolls over” every 32,768 counts. At this time, the total number of errors seen is roughly 1.4 million.
The FR Error Rate roll over period appears to be asymptotically approaching roughly an 11-hour period. The period decreases and increases based on cooling or heating (respectively) of the MODIS electronics from internal calibrations (BB, SRCA, and SD/SDSM) activities. However, once an activity has completed, and the MODIS electronic thermal balance returns to “non- activity” levels, the error rate returns to it previous 11-hour roll over period.
An error tracking spreadsheets have been updated and can be retrieved from:
ftp://www.mcst.ssai.biz/pub/permanent/IOT/am1/analysis/FR_events/
An MS Excel spreadsheet called, AM1_FR_error_rollovers_MMDDYY.xls contains the data for the times each of the error count “roll over” occurs (with the MMDDYY denoting the date the spreadsheet was made on, the more recent date containing the most up-to-date information).
MODIS is in Science Mode on the A-side with the SVD and NAD open, operating with the Formatter Resolution Flight Software Patches (FRFSP).
Note: SD/SDSM calibrations were planned to be reduced to once per two weeks. This plan has been revised; SD/SDSM calibrations will continue to be scheduled once each week until the end of November.
Instrument temperatures across the board are rising slightly as of late, although the orbit beta angle has not yet reached its minimum.
The Network Communications Center (NCC) has been rejecting and/or canceling Terra TDRSS contact times (likely to support DOD satellites). This has resulted in at least one incidence of data loss.
On DOY 2001/292, at 18:11:37 there was a data loss due to contact scheduling problems (the reason described above). This resulted in 1,702,006 CADUs of MODIS Data being lost. (A CADU is 7168 bits.) MODIS was in FR Day Rate at this time, and the data corresponds to roughly 19:17 (MM:SS) of Day Rate Science Data.
The full Data Loss Report can be viewed at:
http://jupiter02.gsfc.nasa.gov/
Select "Search Data Losses", and provide the following information:
Data Type: MOD Loss Start: 292/18:11:37
Then press the big SUBMIT button.
SRCA 10W Lamp #1: 192.2 of 500 hours
SRCA 10W Lamp #2: 146.6 of 500 hours
SRCA 10W Lamp #3: 155.8 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours
SRCA 1W Lamp #1: 558.3 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours
Solar Diffuser Door: 1739 of 3022 Movements
Nadir Aperture Door: 532 of 1316 Movements
Space View Door: 437 of 1316 Movements
Email the MODIS IOT
to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster
to report any problem with the MCST Web Pages.
Email the MCST Helpdesk
to ask a question about Level 1B usage, algorithms or software.
Last Update: Wednesday, 26-Feb-2003 15:54:42 EST