MAIN PAGEMODIS INFOINSTRUMENT OPSWeekly ReportsMODIS HistoryCALIBRATIONL1B PRODUCT INFO
|
MODIS IOT Terra Weekly Report
Mission Operations Days: 2001/237 to 2001/243
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Terra (AM-1) is in Normal Ops Mode MODIS is in Science Mode - A Side |
||
| Component | State(s) | Comment |
|---|---|---|
| Blackbody | A On (290 K); B Off | Nominal |
| Calibration Electronics | A On; B Off | Nominal |
| Control Processor | A On; B Off | Nominal |
| Nadir Door | Unlatched, Open | Nominal |
| Space View Door | Unlatched, Open | Nominal |
| Solar Diffuser Door | Unlatched, Closed | Nominal |
| FDDI Formatter | A On; B Off | Nominal |
| FDDI Port | A On; B Off | Nominal |
| FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal |
| Format Processor | A On; B Off | Nominal |
| Power Supplies | #1 On; #2 Off | Nominal |
| PV VIS FPA | A On; B Off | Nominal |
| PV NIR FPA | A On; B Off | Nominal |
| PV SMIR FPA | A On; B Off | Nominal |
| PV LWIR FPA | A On; B Off | Nominal |
| PC LWIR FPA | A On; B Off | Nominal |
| RC Outgas Heaters | All Off (CS, IS, OS) | Nominal |
| RC LWIR FPA Heater | On (83 K) | Nominal |
| RC SMIR FPA Heater | Off | Nominal |
| Scan Assembly | A On; B Off | Nominal |
| SDSM | A Off; B Off | Nominal |
| SRCA | A Off; B Off | Nominal |
| PS1 Survival Heater | Enabled | Nominal |
| PS2 Survival Heater | Enabled | Nominal |
| Timing Generator | A Off; B On | Nominal |
| Flight Software | Rev BD + 2 set of patches
| Nominal |
| Inhibit Ids Set | None | Nominal |
| TMON 66 (SRCA A) | Disabled | Nominal |
| TMON 67 (SRCA B) | Disabled | Nominal |
| TMON 68 (FIFO) | Enabled | Nominal |
| TMON 69 (EPS Current) | Disabled | Nominal |
None
Sunday, August 26, 2001None
Monday, August 27, 2001None
Tuesday, August 28, 2001one
Wednesday, August 29, 2001
2001/241 20:21:04 ATC OA-16: SD/SDSM Screened
2001/241 21:59:57 ATC OA-15: SD/SDSM Open
None
Friday, August 31, 2001None
The formatter memory loads were not performed to clear the existing error addresses/counts.
None
Saturday, September 1, 2001None
Sunday, September 2, 2001None
Monday, September 3, 2001None
Tuesday, September 4, 2001Anticipated day to perform memory load to clear FR error/count buffers
Wednesday, September 5, 2001
Two orbits with SMIR Itwk/Vdet of 79/110
SD/SDSM calibrations
None
Friday, September 7, 2001None
The next Lunar Calibration roll maneuver is scheduled for day 2001/250 (September 7, 2001) with data collection from 20:03:47 to 20:10:17. The roll angle will be -7.5106 degrees.
The rate of formatter “error events” has increased during the past week to approximately 60-120 per day. There still have not been any noticeable impacts to operations.
MODIS is in Science Mode on the A-side with the SVD and NAD open, operating with the Formatter Resolution Flight Software Patches (FRFSP).
Note: SD/SDSM calibrations were planned to be reduced to once per two weeks. This plan has been revised; SD/SDSM calibrations will continue to be scheduled once each week until the end of November.
Trending has resumed with the instrument on the A-side. With the currently decreasing beta angle, the amount of focal plane heater margin is increasing. The intermediate stage cooler temperature is stable.
None.
SRCA 10W Lamp #1: 189.1 of 500 hours
SRCA 10W Lamp #2: 144.8 of 500 hours
SRCA 10W Lamp #3: 154.0 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours
SRCA 1W Lamp #1: 558.0 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours
Solar Diffuser Door: 1691 of 3022 Movements
Nadir Aperture Door: 532 of 1316 Movements
Space View Door: 437 of 1316 Movements
Email the MODIS IOT
to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster
to report any problem with the MCST Web Pages.
Email the MCST Helpdesk
to ask a question about Level 1B usage, algorithms or software.
Last Update: Wednesday, 26-Feb-2003 14:08:53 EST