Mission Operations Days: 2001/076 to 2001/082
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Terra (AM-1) is in Normal Ops Mode MODIS is in Science Mode - B Side |
||
| Component | State(s) | Comment |
|---|---|---|
| Blackbody | A Off; B On (290 K) | Nominal |
| Calibration Electronics | A Off; B On | Nominal |
| Control Processor | A Off; B On | Nominal |
| Nadir Door | Unlatched, Open | Nominal |
| Space View Door | Unlatched, Open | Nominal |
| Solar Diffuser Door | Unlatched, Closed | Nominal |
| FDDI Formatter | A Off; B On | Nominal |
| FDDI Port | A On; B Off | Nominal |
| FIFO Memory | #1 & #2 Off; #3 & #4 On | Nominal |
| Format Processor | A Off; B On | Nominal |
| Power Supplies | #1 Off; #2 On | Nominal |
| PV VIS FPA | A Off; B On | Nominal |
| PV NIR FPA | A Off; B On | Nominal |
| PV SMIR FPA | A Off; B On | Nominal |
| PV LWIR FPA | A Off; B On | Nominal |
| PC LWIR FPA | A Off; B On | Nominal |
| RC Outgas Heaters | All Off (CS, IS, OS) | Nominal |
| RC LWIR FPA Heater | On (83 K) | Nominal |
| RC SMIR FPA Heater | Off | Nominal |
| Scan Assembly | A Off; B On | Nominal |
| SDSM | A Off; B Off | Nominal |
| SRCA | A Off; B Off | Nominal |
| PS1 Survival Heater | Enabled | Nominal |
| PS2 Survival Heater | Enabled | Nominal |
| Timing Generator | A Off; B On | Nominal |
| Flight Software | Rev BD + 1 set of patches
| Nominal |
| Inhibit Ids Set | None | Nominal |
| TMONs Enabled | 68 | Nominal |
None
Sunday, March 18, 2001None
Monday, March 19, 2001None
Tuesday, March 20, 2001None
Wednesday, March 21, 2001
2001/080 11:29:25-11:40:53 ATC OA15: SD/SDSM Open
2001/080 13:08:17-13:19:45 ATC OA16: SD/SDSM Screened
None
Friday, March 23, 2001None
None
None
Sunday, March 25, 2001None
Monday, March 26, 2001None
Tuesday, March 27, 2001None
Wednesday, March 28, 2001None
Thursday, March 29, 2001None
Friday, March 30, 2001None
There will be no MODIS roll maneuver in April because the roll angle would have been too great.
The next roll maneuver will be scheduled in May.
There appears to be a problem processing the science data collected during the SRCA activities on Friday, March 2nd, 2001 (day 061). Specifically, this may be related to the change in sector sizes for the Solar Diffuser and SRCA. If this is the cause, it will affect data from 061/14:06:30 to 061/18:21:56 GMT. This problem is not yet well understood.
MODIS is in Science Mode on the B-side with the SVD and NAD open, operating with the Formatter Resolution Flight Software Patches (FRFSP).
Temperature trends are correlating with the solar beta angle.
None
SRCA 10W Lamp #1: 182.5 of 500 hours
SRCA 10W Lamp #2: 141.1 of 500 hours
SRCA 10W Lamp #3: 150.3 of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours
SRCA 1W Lamp #1: 557.2 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours
Solar Diffuser Door: 1567 of 3022 Movements
Nadir Aperture Door: 532 of 1316 Movements
Space View Door: 437 of 1316 Movements
Email the MODIS IOT
to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster
to report any problem with the MCST Web Pages.
Email the MCST Helpdesk
to ask a question about Level 1B usage, algorithms or software.
Last Update: Friday, 21-Feb-2003 14:39:34 EST