MODIS IOT Terra Weekly Report
Mission Operations Days: 2000/155 to 2000/161
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Terra (AM-1) is in Normal Ops Mode MODIS is in Science Mode - A Side MODIS has no known Anomalies |
||
| Component | State(s) | Comment |
|---|---|---|
| Blackbody | A On (290 K); B Off | Nominal |
| Calibration Electronics | A On; B Off | Nominal |
| Control Processor | A On; B Off | Nominal |
| Nadir Door | Unlatched, Open | Nominal |
| Space View Door | Unlatched, Open | Nominal |
| Solar Diffuser Door | Unlatched, Closed | Nominal |
| FDDI Formatter | A On; B Off | Nominal |
| FDDI Port | A On; B Off | Nominal |
| FIFO Memory | #1 & #2 On; #3 & #4 Off | Nominal |
| Format Processor | A On; B Off | Nominal |
| Power Supplies | #1 On, #2 Off | Nominal |
| PV VIS FPA | A On; B Off | Nominal |
| PV NIR FPA | A On; B Off | Nominal |
| PV SMIR FPA | A On; B Off | Nominal |
| PV LWIR FPA | A On; B Off | Nominal |
| PC LWIR FPA | A On; B Off | Nominal |
| RC Outgas Heaters | All Off (CS, IS, OS) | Nominal |
| RC LWIR FPA Heater | On (83 K) | Nominal |
| RC SMIR FPA Heater | Off | Nominal |
| Scan Assembly | A On; B Off | Nominal |
| SDSM | A Off; B Off | Nominal |
| SRCA | A Off; B Off | Nominal |
| PS1 Survival Heater | Enabled | Nominal |
| PS2 Survival Heater | Enabled | Nominal |
| Timing Generator | A On; B Off | Nominal |
| Flight Software | Rev BD + 1 set of patches
| Nominal |
| Inhibit Ids Set | None | Nominal |
| TMONs Enabled | 66, 67 | Nominal |
None
Sunday, June 4, 2000None
Monday, June 5, 2000
2000/157 10:44:50 ATC OA15 SD/SDSM Open
2000/157 11:36:24 ATC OA19 SRCA Full Radiometric
2000/157 12:00:00 ATC - Blackbody to 270K
2000/157 12:23:43 ATC OA16 SD/SDSM Screened
2000/158 06:00:00 ATC Blackbody to 280K
2000/158 10:00:00 ATC Blackbody to 285K
2000/158 12:00:00 ATC Blackbody to 290K
2000/158 13:31:49 Real-time Set Blackbody duty cycle to 100%
2000/158 14:00:00 ATC Blackbody to 295K
2000/158 16:00:00 ATC Blackbody to 300K
2000/158 18:00:00 ATC Blackbody to 315K
2000/158 20:00:00 ATC Blackbody to 270K
2000/158 20:22:23 Real-time Set Blackbody duty cycle to 33%
2000/159 10:32:24 ATC OA16 SD/SDSM Screened
2000/159 11:23:57 ATC OA23 SRCA Full Spatial
2000/159 19:00:00 ATC Blackbody to 290K
None
Friday, June 9, 2000
2000/161 08:41:06 ATC OA16 SD/SDSM Screened
2000/161 09:29:36 ATC OA22 SRCA Full Spectral, 30W part I
2000/161 11:24:23 ATC OA22 SRCA Full Spectral, 30W part II
2000/161 13:46:50 ATC OA22 SRCA Full Spectral, 10W part I
2000/161 14:42:09 ATC OA22 SRCA Full Spectral, 10W part II
None
None
Sunday, June 11, 2000None
Monday, June 12, 2000
2000/164 05:54:08 ATC OA15 SD/SDSM Open
2000/164 12:29:39 ATC OA16 SD/SDSM Screened
2000/164 20:02:00 ATC - Blackbody to 270K
2000/165 14:00:00 ATC Blackbody to 315K
2000/165 14:?? Real-time Set Blackbody duty cycle to 100%
2000/165 21:00:00 ATC Blackbody to 270K
2000/165 21:?? Real-time Set Blackbody duty cycle to 33%
2000/166 ?? ATC OA16 SD/SDSM Screened
2000/166 19:00:00 ATC Blackbody to 290K
None
Friday, June 16, 20002000/168 ?? ATC OA16 SD/SDSM Screened
Tue, June 20, 2000 – Drag Makeup Maneuver
Wed, June 21, 2000 – MODIS Roll #1 (2000/173/21:50:10 – 21:56:40), roll degree = -18.0044
Wed, June 21, 2000 – MODIS Roll #2 (2000/173/23:28:43 – 23:35:13), roll degree = -17.4518
Wed, June 21, 2000 – MODIS Roll #3 (2000/174/01:07:16 – 01:13:46), roll degree = -16.9070
None.
MODIS is in Science Mode on the A-side with the SVD and NAD open.
Telemetry is nominal.
Science Data Losses 159/20:00 – 160/20:00: 46362 CADUs of MODIS (equivalent to 31 sec. Day Mode) lost at 160/16:32:33z due to FOT Ops. Error. FOT failed to implement workaround for very high MODIS Buffer amount (86% full). Lockup loss was overwritten before it could be played back.
Additional setbacks from the Ampex tape drive anomalies at White Sands have resulted in numerous data processing backlogs. The following days are still being processed (in the order listed): 147-150, 131-136
SRCA 10W Lamp #1: 166.7 of 500 hours
SRCA 10W Lamp #2: 132.7 of 500 hours
SRCA 10W Lamp #3: 141.9of 500 hours
SRCA 10W Lamp #4: 61.5 of 500 hours
SRCA 1W Lamp #1: 554.6 of 4000 hours
SRCA 1W Lamp #2: 276.3 of 4000 hours
Solar Diffuser Door: 1363 of 3022 Movements
Nadir Aperture Door: 532 of 1316 Movements
Space View Door: 437 of 1316 Movements
Email the MODIS IOT
to report any problem with the MODIS IOT Web Pages.
Email the MCST Webmaster
to report any problem with the MCST Web Pages.
Email the MCST Helpdesk
to ask a question about Level 1B usage, algorithms or software.
Last Update: Thursday, 27-Feb-2003 12:47:52 EST